No Picture
Hybrids and Energy Storage

Sungrow commissions 400 MWh BESS in Malaysia

Sungrow commissioned the 100 MW/400 MWh Santong battery energy storage project (BESS) in Terengganu, Malaysia. It is owned and developed by Tenaga Nasional Berhad (TNB). Sungrow supplied 90 PowerTitan 2.0 liquid-cooled BESS units along with […]

Editorial

Editorial: June 2026

Two significant inefficiencies continue to plague the renewables sector, demanding continued discussions. One, the curtailment of renewables due to grid-related challenges; and two, the 44.8 GW of renewable projects that remain stranded with unsigned power […]