MoP chalks out comprehensive plan for evacuation of power from the planned renewable capacity by 2030
The Ministry of Power (MoP) constituted a high-level committee for planning the transmission system required for having 500 GW of non-fossil fuel based installed capacity by 2030. The committee prepared a detailed plan titled “Transmission […]