
Wind Power
Connecting Renewables: CERC proposes procedure for linking projects to ISTS
Smooth grid integration continues to be a challenge for the renewable energy sector in the country. Besides intermittent power generation and poor existing grid infrastructure, the lack of grid connectivity in remote areas is a […]