reNIKOLA signs PPA for 363 MWp solar project in Sarawak

reNIKOLA Gedong Solar Sdn Bhd, a subsidiary of reNIKOLA Holdings, has signed a 30-year power purchase agreement (PPA) with Syarikat Sesco Berhad for a solar project in Sarawak, Malaysia. The project will have an installed capacity of up to 363 MWp (250 MWac). The project involves an estimated investment of approximately RM1 billion. 

In July 2026, Malaysia’s Ministry of Energy Transition and Water Transformation (PETRA) announced the sixth round of its Large-Scale Solar (LSS6) programme, targeting 2.5 GW of solar capacity paired with 1.25 GW of battery energy storage systems (BESS). The tender will be implemented in three lots, with the first lot comprising 2.2 GW solar and 1.1 GW BESS package open to all developers.  

In December 2025, Shizen Energy reached financial close for a 29.99 MWac utility-scale solar project in Gurun, Kedah, Malaysia under the Corporate Green Power programme. The project company, SM 01 Sdn. Bhd., has entered into a PPA with Google The project is scheduled to commence commercial operations in 2027. The project will provide Google with energy attributes generated from the solar plant.