EVLO Energy Storage has announced the launch of EVLO Synergy BESS. The system combines high-density LFP technology and has a nominal energy capacity of 5 MWh. The BESS provides a flexible duration of two-four hours. It is a fully tested and integrated storage system that reduces on-site work during installation. The product meets the NFPA 69 safety standards and is UL 9540 certified. The battery can run up to 9,125 cycles over 25 years without requiring any battery replacements. The system has an efficient design, minimising land usage, construction materials and project timelines, which makes it optimal for large-scale projects.
