Siemens Gamesa Renewable Energy has received a firm order from Adani Green Energy supplying 215 SG 2.2-122 wind turbines, for a cumulative 473 MW of wind power capacity to be developed in Rajasthan. The scope of work includes manufacturing, supply, installation and pre-commissioning of the wind turbines for the project in Fatehgarh in Rajasthan. Siemens Gamesa has signed several projects with Adani, which add up to 391.2 MW. Of this capacity, 87.6 MW has already been commissioned, with the remaining capacity being under construction.