UID cancels bids for development of 40.84 MW solar power project in Uttarakhand

The Uttarakhand Irrigation Department (UID) has cancelled the Request for Proposal bids for the development of 40.84 MW of grid-connected solar power projects at the periphery of two dams, Haripura (27.34 MW) and Tumariya (13.5 MW). The projects were to developed in the Udham Singh Nagar district of Uttarakhand on build, own, operate and transfer basis. The bids were invited in January 2019.

GET FREE ACCESS TO OUR ARTICLES

Enter your email address