NREDCAP rolls out seasonal tracking solar power tender

The New and Renewable Energy Development Corporation of Andhra Pradesh has released a 1 MW EPC tender for developing a grid-connected solar project with seasonal tracking features for captive utilisation of power on behalf of the Sri Durga Malleswara Swamy Varla Devasthanam in Indrakeeladri, Vijayawada. It will be executed on a net metering basis. The project will be developed at Pathapadu village in Vijayawada. The successful bidder will provide O&M services for 10 years. Five acres of land has been set aside for the purpose. Moreover, the successful bidder will have to provide a transmission line from the project site to a substation by constructing a bay.